HCS Case Study 3 - Crawley Hospital
New disaggregated boiler installation at Crawley hospital
The hospital is a 60's style tower block with all the normal problems. Large old oil boilers were inefficient. Upper floors required new windows. Domestic hot water not within legionella temperatures. Key Benefits | Upper floors fitted with new PVC windows at no cost to Trust |  | Central boilers and unsightly chimneys disposed of |  | Investment of £2.5m repaid through guaranteed savings over 12 years |
For 15 months afterwards we supplied a Chartered Engineer and ex-NHS Consultant as Head of Estates to take the Trusts Estates department through merger.
|